Dec. 2nd, 2006

robby: (Default)
I've finished the framing, walls and door of the office addition. I've been using a level, so everything, so far, is square and sturdy. I had to borrow an electric mitre saw to get some little ceiling supports cut exactly right. The next thing is to put in the windows, and then the roof. Everything should look decent when I've finished, and I have certain standards. A few things I've done over, but the finished product won't be a totally professional job. It's only six feet by twelve feet, and I'm using two existing walls. It has cost me less than $300 in materials, where a contractor would charge thousands to build it.

I should be working on stuff right now, but I've caught a cold, and came home for a while.

I got a big order on Friday, and it'll keep us busy for the next few weeks. This customer pays COD, so I'll get the money right away, which is always nice, especially right before Christmas.

My girlfriend is back, but she has more business to do, and will go back to the PI during Xmas and New Years.

Profile

robby: (Default)
robby

June 2024

S M T W T F S
      1
2345678
9101112131415
16171819202122
23 242526272829
30      

Page Summary

Style Credit

Expand Cut Tags

No cut tags
Page generated Sep. 2nd, 2025 06:55 am
Powered by Dreamwidth Studios